Unbound Journeys with Nike
Unbound Journeys with Nike Unbound Journeys with Nike
Cart(0)
Home Nike Tech Fleece Nike Tech Fleece Jacket
Product Details

Troy Lee Designs Flowline MTB Helmet

The Troy Lee Designs Flowline MTB Helmet delivers top-tier protection, comfort, and ventilation in a sleek, minimalist design—all at an affordable price. Engineered with Mips® B-Series Rotational Impact Protection, a full 360-degree fit retention system, and extended coverage, this helmet ensures premium safety and all-day comfort for trail riders.

Key Features

  • Mips® B-Series Protection – Reduces rotational forces in the event of a crash.
  • 3-Way Adjustable Screwless Visor – Easy customization for sun and debris protection.
  • Full 360° Fit Retention System – Secure, comfortable, and adjustable fit.
  • 14 Vents – Maximized airflow to keep you cool.
  • Full Wrap In-Mold Construction – Lightweight yet highly protective shell.
  • Extended Coverage – Increased protection for trail riding.
  • Side Strap Adjusters – Quick and easy fit adjustments.

With a Five-Star Safety Rating from Virginia Tech, the Flowline MTB Helmet is built for riders who demand reliable performance, comfort, and protection—without breaking the bank.

Troy Lee Designs Flowline MTB Helmet - Point - Infra Red
  • Infra Red
  • X-Small/Small
  • Medium/Large
  • X-Large/2X-Large

$ 119.99

$ 60.00

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
Unbound Journeys with Nike
Your cart is currently empty.