Unbound Journeys with Nike
Unbound Journeys with Nike Unbound Journeys with Nike
Cart(0)
Home Nike Tech Fleece Nike Tech Fleece Jacket
Product Details

Troy Lee Designs Flowline SE MTB Helmet

The Troy Lee Designs Flowline SE MTB Helmet combines cutting-edge safety, premium comfort, and a sleek minimalist design to deliver top-tier performance for trail riders and eMTB enthusiasts. Equipped with Mips® B-Series Rotational Impact Protection, an extended coverage shell, and a Five-Star Safety Rating from Virginia Tech, this helmet ensures unmatched protection on every ride.

Key Features

  • Mips® B-Series Protection – Reduces rotational impact forces in the event of a crash.
  • eMTB Certified – Built for high-speed, high-intensity rides.
  • 3-Way Adjustable Screwless Visor – Easily customized for sun and debris protection.
  • Full 360° Fit Retention System – Adjustable for a secure and personalized fit.
  • 14 Vents – Optimized airflow for maximum cooling.
  • Full Wrap In-Mold Construction – Lightweight, durable, and impact-resistant.
  • Fidlock® Magnetic Buckle System – Quick and secure one-handed closure.
  • Side Strap Adjusters – Easy, on-the-go fit adjustments.

For riders who demand top-tier safety, comfort, and ventilation, the Flowline SE MTB Helmet is a performance-driven trail essential, designed to keep you cool, comfortable, and protected on every adventure.

Troy Lee Designs Flowline SE MTB Helmet - Badge - Camo Blue
  • Blue
  • X-Small/Small
  • Medium/Large
  • X-Large/2X-Large

$ 159.99

$ 80.00

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
Unbound Journeys with Nike
Your cart is currently empty.